Departures
  Runway
  Taxiways
 
SIAL Facilities
Airline From To Flight Craft SCH EST Remarks
SALIENT FEATURES
AIRSIDE FACILITIES
 
    RUNWAY
  • 3600 (M) long- Flexible
  • 45 (M) wide
  • 7.5 (M) wide shoulders
  • 300 (M) long over-runs on both ends
  • LCN 92
  • Capable to handle B-747-200, B-747-400 and
  • B-777 aircrafts
  • Four digits code - OPST
 
    APRON
  • 45000 SQM
  • Capacity:
    Four B-747 / B-777 aircrafts at a time
    OR
    Three B-747 and three F-27 aircrafts
 
  • PARALLEL TAXIWAY (Future)
 
    CONNECTING TAXIWAY
  • 263(M) long
  • Capacity:23 (M) wide
  • 10 (M) wide shoulders
 
    AIRFIEED LIGHTING SYSTEM
  • Cat –II (with a provision to convert to Cat-III)
    Airfield lighting system comprising:
  • Precision approach lights at 04 end
  • Simple approach lights at 22 end
  • Central and edge lights
  • Approach lights
  • PAPIS
 
    FIRE CRASH AND RESCUE (FC&R)
  • Category 9
 
    MISCELLANEOUS
  • Airline maintenance
  • Fencing
  • Drainage network
  • Perimeter track
  • Approach lights
  • Watch & ward towers
 
    NAVIGATIONAL FACILITIES
  • DVOR
  • ILS
  • TDME (Short range)
 
    GROUND HANDLING EQUIPMENT
  • Ground Power Unit. (140KVA, 115Wolts, 400Hz, 28DC & AC).
  • Ground Power Unit. (90KVA, 115Wolts, 400Hz, 28DC & AC).
  • Air Starting Unit (6 Bars with 4 Hoses).
  • AC Van (90 Tons).
  • Main Deck Loader (40000 lbs).
  • Low Lobe Loader (15000 lbs)
  • Tug Master (45000 to 60000 Kg Operating Weight).
  • Tow Tractor For Baggage & Container Trolleys.
  • Catering Van.
  • Flush Cart.
  • Water Cart.
  • Passenger Step Self-Propelled.
  • Passenger Set Tow Able / Manual.
  • Conveyor Belts for Cargo.
  • Fork Lifter (3 Tons-5 Tons).
  • Dollies.
  • Busses
  • Ambulances
  • Mechanical Sweeper
  • Miscellaneous Operational Vehicles & other Equipments
 
    POWER SUPPLY
  • Wapda Commercial Supply
    (From two Different Sources)
  • Stand by Generators
  • Fuel Farm
 
LAND SIDE FACILITIES
 
    Passenger Terminal Building (Category-‘B’) To be ready by end of 2008
  • 1-1/2 level concept
  • Area 10100 SQM (Tentative)
  • Capacity–450 Pax
  • Provision for future extension
 
  • Temporary Passenger Terminal Building available
  • Temporary Passenger Terminal Building available
  • Capacity 350 to 400 cars
  • Provision for future extension
 
    Cargo Terminal
  • Area 4000 SQM (Tentative)
  • Capacity 50000 tons per annum
  • Import
  • Export
  • Cargo parking 50-60 trucks
  •      Admin Building
  •      Airline Offices (Future)
  •      Mosque
  •           Fuel farm
  •           Nursery
  •           ASF camp
  •           Electric supply / distribution system
  •           Petrol pump & Maintenance facilities (Future)
  •           Residential area (Future)
  •           Hotels & motels (Future)
  •           Club house (Future)
  •           Other agencies (Future)
 
    GENERAL
  • Approach road from terminal
    to existing Sialkot/Sambrial road
  • Internal road net work
 
  Home | About Sial | About Airport | Facilities | Picture Gallery | Job Opportunity | Contact Us
  Copyrights 2009 Sialkot International Airport. All Rights Reserved.
  Website designed & Developed By: Web eXperts